Laser Shaft Alignment for Superyachts & Commercial Vessels

Laser Shaft Alignment

Marine Propulsion operates one of only a handful of dedicated marine laser shaft alignment systems in New Zealand, supporting propulsion projects for superyachts, commercial vessels and technically demanding marine applications.

Laser shaft alignment is undertaken as part of propulsion upgrades, complete driveline replacement, major refits, vibration investigations and propulsion commissioning.

The system provides accurate measurement and verification throughout critical stages of a propulsion project.


Typical Projects

Laser shaft alignment is regularly undertaken during:

  • New propulsion system installations

  • Engine replacement

  • Gearbox replacement

  • Complete driveline replacement

  • Major refit programmes

  • Stern tube replacement

  • Bearing replacement

  • Propulsion commissioning

  • Sea trials

  • Vibration investigations

Project scope is determined as part of the wider engineering programme and may involve standalone alignment work or complete propulsion engineering projects.

A large white yacht anchored in a body of water near a rocky hillside covered with green trees, under a clear blue sky.

Engineering Capability

Accurate alignment data supports engineering decisions throughout a propulsion project.

Laser shaft alignment is routinely incorporated into propulsion commissioning, post-installation verification, fault diagnosis and refit programmes where measurement accuracy and documented alignment are required.

Every project is undertaken using dedicated laser alignment equipment operated by experienced propulsion engineers.


Supporting Classification & Commissioning

Laser shaft alignment frequently forms part of engineering work undertaken before sea trials, propulsion commissioning and classification survey requirements.

Alignment can also be scheduled following major propulsion work to verify installation tolerances before the vessel returns to service.

Common Project Questions

Planning a Refit in New Zealand?

Laser shaft alignment is often scheduled during the final stages of propulsion work before commissioning and sea trials.

Early engagement allows alignment to be incorporated into the wider engineering programme and completed at the appropriate stage of the project.